To make this vision a reality, galvanized helical piers were drilled 15+ feet deep into the sandy soil and then capped with reinforced poured-in-place concrete. Three "toothpick" columns support the front of the upper deck, while steel brace columns were installed as a 'tie back' at the rear of the upper deck to prevent uplift from strong prevailing winds. A structural steel deck frame was fabricated, erected, and wrapped in pre-weathered Ipe (Brazilian Hardwood).
The final product is a cohesive landscape that maximizes water views, balances outdoor spaces with the scale and style of the house, and incorporates regional materials and plantings—appearing as if this modern masterpiece has resided here for years.
2024 ASLA Illinois Merit Award